- Reaction score
- 2,020
- Points
- 1,160
Has the RFP for ship design been released yet? Per the last media release in June, it was supposed to be released this summer.
If we have the APAR/Smart-L combination, both of which are currently being updated or have been updated, then at any time we could add the SM3 or we could direct missiles fired from other ships that carry the SM3.MarkOttawa said:Should at least some CSCs have ballistic missile defence capability? One suspects US NORTHCOM/NORAD (their side) would much like:
Report: South Korea Wants BMD Capability for Guided Missile Destroyers
https://news.usni.org/2016/08/15/report-south-korea-wants-bmd-capability-guided-missile-destroyers
Mark
Ottawa
Half Full said:We used to have MARS- E who were software programmers...but we got rid of that sub-occupation years ago. Any uniformed personnel who were working within S-82 since around 2000 were supporting the LM staff and doing very little if any coding. As Tactics Staff we worked directly with the LM personnel who were resident in S-82 to update/upgrade the versions of the CCS.
Irving Halifax Has Lead Evaluating RCN Canadian Surface Combatant Design/Weapons Systems Bids
https://cgai3ds.wordpress.com/2016/08/22/mark-collins-irving-halifax-has-lead-evaluating-rcn-canadian-surface-combatant-designweapons-systems-bids/
MarkOttawa said:Irving certainly seems to have a lot of keys to the kingdom:
Mark
Ottawa
GR66 said:I have a couple of conceptual questions about the CSC design that perhaps some experienced RCN types could answer.
GR66 said:Thanks...I'm sure that's enough detail for a novice like me. Was curious about how the AAD requirement might limit the number of existing designs that might be options for the CSC.
MilEME09 said:Well that also depends, would it be completely off the shelf, or are we just taking a design and modifying it?
SeaKingTacco said:I doubt it- They are long gone to wherever old radars go to die.
SeaKingTacco said:I doubt it- They are long gone to wherever old radars go to die. Besides, that version of the SPS 49 was getting pretty long in the tooth.
jollyjacktar said:That radar didn't survive the HCM project and was replaced by newer, better gear. Besides, the CPF's will still be using their "new" radars when the CSC finally gets into production and they'll want the latest and greatest that fit (budget/training/capability) for the CSC.
GR66 said:If bidders are are expected to be submitting their proposals (in 2017?) for MOTS solutions are we likely to be offered systems much better than the SMART-S, Sea Giraffe, CEROS 200 systems currently installed on the Halifax-class for the GP versions of the CSC?
If the new ships were to be one-for-one replacements of Halifax-class ships and the radars were to be re-used, could that leave a bidder proposing that more money to provide upgraded radars for the AAD versions?
Is re-using a radar system from another ship even an option? I can't say I've every read anything about it. Do radar systems have a lifespan that would rule out their being used beyond a certain number of years?
jollyjacktar said:I'm afraid I am not of the Ops world and that is not my swim lane, so I am not able to comment with any expertise beyond what I have already put out. Sorry.
Lumber said:You don't even know how apt your choice of words was, do you?