George Wallace
Army.ca Dinosaur
- Reaction score
- 184
- Points
- 710
Chris Pook said:Jeez Altair, how else are we going to find out what Montreal thinks? And I look forward to educating you in the niceties of the Scottish tongue..... [
Oldgateboatdriver said:.... Long live Mary, Queen of the Scotts!!!
Man evicted from hotel has ‘no place to go’
Long-term tenants Garnet Fulton and his family are being evicted as a North York hotel welcomes Syrian refugees whose rooms were booked last month.
The Toronto Star
By: Alex Ballingall News, Published on Wed Jan 27 2016
It’s not like Garnet Fulton had everything figured out before the hotel manager gave him the eviction notice. He recently survived a heart attack, can only work the odd shift as a security guard and is making ends meet on government assistance.
But now he has a lot more to worry about.
“We have no place to go,” he said over the phone from his third-floor room at the Toronto Plaza Hotel, which sits in a broad parking lot off Wilson Ave., near the intersection of Highways 400 and 401. Fulton has been living there with his girlfriend and their 2-year-old son, Baron, since last October, when they were kicked out of their Mississauga apartment after the building was deemed to have too many tenants, he said.
Last weekend, he was told by hotel management that he’d have to pack up and leave again — the same week the federal government is putting up hundreds of newly landed Syrian refugees in the Plaza. Fulton isn’t the only long-term hotel tenant being evicted; there are several others, he said.
Fulton said he was initially told he and his family had to leave by Friday, but he’s pushing Plaza staff to let him stay until Monday at least. Fulton pays $1,200 a month for his hotel room. His biggest worry now is having “no food, no shelter, no nothing,” he said.
“What it does to me is, they didn’t give us notice,” said Fulton, 53. “Just basically, ‘Get out.’ ”
Staff at the hotel declined to comment when reached by the Star. A worker at the front desk said the manager had left and wouldn’t answer questions until Thursday.
COSTI Immigration Services was contracted by the government to sort out temporary accommodations for newly arrived refugees in the GTA. Mary Celluci, COSTI spokesperson, said the group booked 150 rooms in the hotel back in December. She said they “didn’t expect” that anyone would be inconvenienced by the refugees’ arrival.
Fulton said he believes he’s being evicted to make room for arriving refugees. He said he welcomes the arrival of people fleeing violence and poverty in other parts of the world, but that he feels the plight of some Canadians shouldn’t be overlooked in the process.
“It hurts,” he said. “Why did this Trudeau guy do this when there’s homeless out there they could’ve helped, there’s needy people he could’ve helped, but he brought people over and — why don’t they start from the ground up?”
Though he’s not sure yet what he’ll do or where he’ll go, Fulton said he’s willing to work as much as he can to find a place to stay with his family.
“I’ll sweep floors, I’ll do anything,” he said. “I push myself, OK? I had a heart attack. Two weeks later I was riding a bike. I’m a fighter.”
With files from Nicholas Keung
Chris Pook said:Colin, I was going to tackle the technicalities - but decided against it as it would all be supposition on my part.
I
The existing mountain corridors have been in service for decades, and the railways for longer. How many disruptions of service have there been in that time due to seismic activity? With respect to the pipelines the vast majority of breaks occur in urban settings where contractors suddenly discover pipelines that are clearly identified. Not many breaks happen in the boonies.
5.4 Tunnel design and construction
The pipeline route segment between the upper reaches of the Clore River and Hoult Creek would cross a section of the Coast Mountains unbroken by low elevation passes. Northern Gateway proposed 2 tunnels, each approximately 6.5 kilometres long, to avoid construction, environmental, and operating risks associated with a conventional pipeline route on steep slopes. Northern Gateway's 2009 preliminary geotechnical report (revised in 2010) examined the geology and anticipated geotechnical conditions for the tunnels.
The geological assessment was based on a field investigation program consisting of geological mapping, core drilling, and geophysics. The field-mapping and drilling program included identifying rock types, estimating rock strength, and characterizing geological structures and discontinuities. Geological and engineering geology profiles were created for the tunnel alignments based on information collected. Rock mass properties for the main rock types along the tunnel alignments were developed and used to estimate tunneling conditions.
Northern Gateway's feasibility assessment considered slope hazards, portal locations, engineering geology, tunneling conditions, tunnel construction, and pipeline design and installation. In addition, tunnel and surface site investigation field work took place in October 2012. This consisted of portal site visits to visually assess the suitability of the proposed tunnel portal locations, geological mapping visits to visually assess geological units along proposed tunnel alignments, and access road and surface works visits to visually assess surface soil units and terrain (e.g., slopes, creeks, and instability). Three individuals representing two different Aboriginal groups participated in these site visits and field work.
Northern Gateway convened an external review panel of international tunneling experts to look at a number of scenarios, particularly with respect to the potential for difficult tunneling in portal areas and in fault zones. That panel concluded that the means exist to safely construct the Clore and Hoult tunnels.
Northern Gateway provided conceptual cross-sectional drawings for the tunnels indicating that each would be approximately 6.8 metres in diameter (Figures 5.1 and 5.2). The tunnels would either be circular or inverted U-shaped, depending on the tunneling method used (bored, or drill and blast). Other preliminary concepts that Northern Gateway presented included:
permanent infrastructure to provide road access for inspection and maintenance to all tunnel portals;
lighting and ventilation for inspection and maintenance;
power supply by either dedicated service line or on-site generator;
a maintenance building for maintenance equipment and material storage;
safety systems for tunnel monitoring that are designed to meet project requirements, and that would be connected to the Enbridge Edmonton pipeline operations control centre through remote communications to provide real-time monitoring;
monitoring sensors to detect vibration, temperature, fire, and gas; and
closing tunnel portal doors during normal operations to prevent unauthorized entry.
Northern Gateway said that it would develop further details about tunnel design and construction during detailed engineering.
The Office of the Wet'suwet'en raised questions about the camp and staging site, and the waste rock dump site. Concerns were related to potential effects from metal leaching and acid rock drainage in Wet'suwet'en territory and on their natural resources. It was also concerned that the volume of potentially acid generating rock is not known.
During the Panel's process, Northern Gateway's experts answered questions about the predicted tunnel waste rock volume, the potential storage space required, and the disposal of sulphide-bearing rock. These experts estimated the volume of in-situ rock from the tunnels at 350,000 cubic metres (plus or minus), assuming an approximately 13,000-metre combined length, a 7-metre width, and a 7-metre height. The locations of the disposal areas are illustrated in Figure 5.5. They also estimated a bulking factor of 30 to 40 per cent, representing 455,000 to 490,000 cubic metres of waste rock. The waste rock volume would depend on the tunnel construction method. Waste disposal fills would be approximately 6 to 8 metres high and would be contoured with the landscape. Regarding sulphide-bearing rock disposal, Northern Gateway's experts expect to segregate sulphide-bearing materials and use established techniques and design principles from the mining industry, such as encapsulation and containment. Another option may be dilution using limestone, depending on the amount of sulphide-bearing materials encountered.
Figure 5.1 Conceptual Drill and Blast Tunnel
Figure 5.1 Conceptual Drill and Blast Tunnel
Figure 5.2 Conceptual Bored Tunnel
Figure 5.2 Conceptual Bored Tunnel
Top of Page
Views of the Panel
The Panel heard evidence of a preliminary nature regarding construction of the Clore and Hoult tunnels. Northern Gateway would determine the final design of the tunnels during detailed engineering. The Panel requires Northern Gateway, before constructing the tunnels, to obtain further information on rock mass quality, groundwater conditions, mitigation measures for groundwater and potential sulphide-bearing rock, confined space entry procedures, final cross-sectional drawings, and the tunnel construction plans.
The Panel is of the view that Northern Gateway may have under-estimated the waste rock bulking factor given the rock type classifications in the preliminary geotechnical report for the tunnels and potential alignment changes. The Panel requires Northern Gateway, before constructing the tunnels, to develop final details on the location, size, and design of waste rock disposal. Provisions within the National Energy Board Act would allow Northern Gateway to apply for National Energy Board approval of amendments to its disposal locations, if necessary.
@Kady: Liberals to vote down pro-Energy East pipeline motion put forward by Tories
January 28, 2016 1:12 pm
Bad news, Energy East enthusiasts: Despite continuing pressure from Western Canada, the federal Liberals aren’t willing to publicly back the pipeline proposal in a House vote — not yet, anyway.
According to the Prime Minister’s Office, a Tory-initiated motion calling on the House to express its support for the project would undermine the process currently underway.
“[The motion] is inconsistent with the party’s pledge to review the current environmental assessment process,” and the party’s plan to “modernize and rebuild trust in the National Energy Board,” PMO spokesman Cameron Ahmad told the Ottawa Citizen.
“Therefore, Liberal MPs will be voting against it.”
The Tories introduced the motion — which also seeks to have the Liberals “acknowledge the desire for the Energy East pipeline expressed by the provincial governments of Alberta, Saskatchewan, Ontario, and New Brunswick” — just one day after the prime minister held a closed-door chat with Montreal Mayor Denis Coderre, who has been a vocal opponent of TransCanada’s proposal to revamp existing infrastructure in order ship crude oil from Alberta to New Brunswick.
I wish I had the energy.PuckChaser said:So much for free votes in the Commons. Liberal MPs were whipped into defeating a Tory motion to publically support Energy East. Probably the same reason they were shut out in of the 4 western provinces. Wonder how all those NB MPs are going to fair when they find out their MPs voted against more jobs at refineries for their constituents?
http://ottawacitizen.com/storyline/kady-liberals-to-vote-down-pro-energy-east-pipeline-motion-put-forward-by-tories
Altair said:I wish I had the energy.
Alas, I do not.
Altair said:I wish I had the energy.
Alas, I do not.
Officially taking a break from this site.
PuckChaser said:So much for free votes in the Commons. Liberal MPs were whipped into defeating a Tory motion to publically support Energy East. Probably the same reason they were shut out in of the 4 western provinces. Wonder how all those NB MPs are going to fair when they find out their MPs voted against more jobs at refineries for their constituents?
http://ottawacitizen.com/storyline/kady-liberals-to-vote-down-pro-energy-east-pipeline-motion-put-forward-by-tories
Lumber said:Isn't this a good thing? Shouldn't parliament keep their hands off and let the NEB do their thing? I've only read the part of the article that was cut and pasted here, but it smells like the Tories knew the Liberals would shut it down, and pushed the motion to force the Liberals between a rock and a hard place.
Business of Supply
The Order was read for the consideration of the Business of Supply.
Ms. Bergen (Portage—Lisgar), seconded by Mr. Bernier (Beauce), moved, — That, given this time of economic uncertainty, the House: (a) recognize the importance of the energy sector to the Canadian economy and support its development in an environmentally sustainable way; (b) agree that pipelines are the safest way to transport oil; (c) acknowledge the desire for the Energy East pipeline expressed by the provincial governments of Alberta, Saskatchewan, Ontario, and New Brunswick; and (d) express its support for the Energy East pipeline currently under consideration.
Two different and opposite issues here. You are absolutely correct, Parliament should keep its hands off, although I notice that the mayors don't have any business trying to step in either. And the motion did leave space to support the NEB process. But the second and more fundamental issue is the idea of whipping the party. Better to have made a request and presented the arguments in caucus for a no vote but still left each member free to vote their conscience. Now JT appears as the same tyrant that folks have accused Harper of being. He lost credibility and broke an election promise at the first hint of conflict, much as he appointed his first potential candidate before the election after saying appointments were entirely a local matter. The optics are really bad.Lumber said:Isn't this a good thing? Shouldn't parliament keep their hands off and let the NEB do their thing? I've only read the part of the article that was cut and pasted here, but it smells like the Tories knew the Liberals would shut it down, and pushed the motion to force the Liberals between a rock and a hard place.
For members of the Liberal Caucus, all votes will be free votes except those that implement the Liberal platform, traditional confidence matters, and those that address the Charter of Rights and Freedoms.
PuckChaser said:The Liberal government is now on record for not supporting any of these provisions.
PuckChaser said:The Liberal's own platform supported Energy East, but they were whipped into voting against it.