*Note sure how to post pictures* Here's another link to flight II:
http://www.globalsecurity.org/military/systems/ship/images/ddg-80-22.jpg
I wonder if it would be possable to "split" the aft 64 VLS into two batches of 32. Then move both batches to the Port and Starboard of their current locations, then were the current Mk 41s are, locate a new single (slightly taller) Hanger......
Thats assuming that my "idea" wouldn't throw the ships stability out of whack.....
http://www.globalsecurity.org/military/systems/ship/images/ddg-80-22.jpg
I wonder if it would be possable to "split" the aft 64 VLS into two batches of 32. Then move both batches to the Port and Starboard of their current locations, then were the current Mk 41s are, locate a new single (slightly taller) Hanger......
Thats assuming that my "idea" wouldn't throw the ships stability out of whack.....