Oldgateboatdriver said:Contrary to what you may think, it does not use their modular approach as a cost saving measure.
The rationale behind the Standard Flex concept and its continued usage is well documented AND available online, so i will refrain from posting a wall of text reciting its history. What i can say is that your conclusion is wrong ( StanFlex was and still is ,very much a cost saving measure....among other things. Its also much more than just containerized weapons and equipment)
they simply do not have the financial capability of buying themselves full service frigates right off the bat.
We have plenty financial capability, but not the will to spend it on Defence. Not unlike Canada i suppose ;-) ...
All of which has absolutely nothing to do with StanFlex however.
For instance, right now, of the three Iver Huitfeld in service (which is the totality of the class), only the first one is now fully kited out for AAW.
Actually none of them are yet. We wont get long range Standards (SM-2 or 6) til next year at the earliest. The mk56 ESSM launchers are operational aboard all 3 frigates however so they have basic AAW capability at least.
The other two have their launchers (mechanical boxes portion) in place, but neither missiles nor the electronics, nor their combat system software to carry out any AAW duties.
That is incorrect ! ..electronics and combat systems software is in place, but integration of SM-2/6 into the mk41 will likely take place sometime in 2017.
They will have all that in place and be fully operational on that aspect only in four years from now,
Pardon my french , but bollocks ! Where do you get your info from ? Regardless i would suggest you get some better sources .
The 4 year plan is not about AAW but the upcoming BMD upgrade which is scheduled for completion in the 2019-20 timeframe.
the actual cost of each frigate will have risen to $900M USD each.
BS!...you would have to cram the mk41s full of SM-3s to get near 900 million USD.
As delivered from the shipyard(OSS) the huitfeldts was $165M USD each in 2010 dollars. That cost is indisputable.
The AAW suite from Thales Netherlands came in at ~$110M USD in same year dollars. Also indisputable
The Atlas Sonar,Star Safire mk III FLIR, surface and navigational radars,ESM system,link&communications systems,the combat system and the MK41 launchers etc makes up the remainder of the price quoted officially at ~$325-330M USD (2010)
What isnt included is :
2x76mm Oto Melara SR
1x35 mm Millenium CIWS
2xMk56 VLS with 24 ESSM
2xMk141 Harpoon launchers with 16 Harpoon block II missiles.
SM-2 missiles.
2xCEROS 200 Fire control directors
Most of the outfitting and integration of these sensors,weapons and military electronics was carried out by RDN technical personel or civilian subcontractors. As such that work was not accounted for in the acquisitions project but with funds taken from another budget (the navy's operating budget)
All that adds up to another 200-250 million USD on top of the official purchase price.
But even with the $100M USD BMD upgrade (radar and CMS) you are well short of the $900 million you claim.
a country with a GDP smaller than that of the Province of Quebec
Riiight.....But no
Quebec GDP : ~360 billion CAD
Denmark GDP : ~420 billion CAD
And Quebec has a population almost 50% larger than Denmarks (8,2 vs 5,6 million)
Its actually more like 6 years ....and name me 1 navy (other than the US) that goes from commission to FOC in 3 years ?by spreading the cost of getting them to full capacity over a much longer period of 12 years instead of three or four.