FSTO
Army.ca Fixture
- Reaction score
- 5,864
- Points
- 1,210
Well the Korean yards can do something like this in 20 to 24 months (likely even less). But Seaspan had to retool and the first of class is always the slowest. We've known we needed to replace the AOR's back in the 90's. We are just bad at planning and long range thinking.Question from the resident crayon eater:
How long should it take to build this ship?