Occam said:While the CPFs were built with a modular design, I think the ability to vary the number of modules was supposed to be done during the construction process, and not as an afterthought 20 years after they hit the water. The sheer number of wiring, cabling, plumbing, and ventilation connections that would have to be lined up (or completely rerun) with a new module would be staggering. I'm sure it's technically possible, but the costs would be prohibitive.
Not to mention from the FELEX guys I have talked to impractical.