The CGCM has checklists for equipment systems, but unless I'm misreading the post, that's not what he's asking for. For example, if you look up the LCT in the CGCM it will state that the LCT system contains the amplifier, coupler, power distribution panel, various cables, etc etc etc. What it won't say is that the LCT is to deploy as part of a NCCIS (Lt) det along with x number of INMARSAT's, y amount of PP&S, and z amount of POL, which is what I think the original post was about.