ELE 2020 Baseline. Required structural upgrades and additional avionics update requirements to meet the current ELE are forecasted. While the required structural upgrade costs are known and funded, the avionics upgrades needed to meet the ELE 2020 target are a recent requirement, not identified during the previous CF-18 ELE extension study. These costs are not yet funded.
ELE 2025. A CF-18 ELE extension to 2025 is assessed as a low risk option in terms of cost, schedule and technical factors. This ELE target would generate some robust requirements in order to manage continuing airworthiness and obsolescence issues.
ELE 2030. A CF-18 ELE extension to 2030 would be a very technically challenging, lengthy and costly endeavour. A majority of the fleet (50 aircraft) would need to be flown beyond the currently certified safe life of 1.0 FLEI based on current projections, and also requires all CF-18s to undergo CP3. This would necessitate development of a new structural life extension program, with some significant NRE costs to develop and certify the requisite modifications, repairs and inspections. A large and costly procurement of new wings and flight controls would also be required to support this effort, as the structural lives of these components would expire for many of the fleet’s aircraft.